Solvait
    For construction companies & delivery arms

    HR that moves at the speed of the project.

    Mass onboarding, site attendance, overtime-heavy payroll, safety certifications and end-of-service at project close. HR for how construction actually works.

    Ask for the mobilization-to-demobilization walkthrough. We will run it on one of your projects.

    260+
    Enterprise clients, including engineering and construction groups
    Since 2011
    Riyadh, Amman, Cairo and Aleppo
    50%
    Of HR admin time saved
    99.9%
    Platform uptime

    Sound familiar?

    Not a list of HR challenges. This is the six weeks after the award letter, and after the handover certificate.

    You won the award, and now you have six weeks to put four hundred men on site, run out of one spreadsheet and a WhatsApp group.

    Attendance arrives as a device export from one project and photographs of paper sheets from another, and somebody retypes both.

    Payroll is overtime-heavy, so one wrong rate compounds across hundreds of workers before anybody notices.

    Project close is a demobilization wave: hundreds of end-of-service calculations at the moment the project team has moved on.

    The project lifecycle

    Mobilize. Operate. Move. Demobilize.

    A construction workforce does not sit still long enough for an HR system built around a head office. Every part of Solvait on this page hangs off one of these four phases.

    1. 01

      Mobilize

      Import the manpower list once: employee records, GOSI registration, Iqama tracking.

    2. 02

      Operate

      Rosters by site and shift. Attendance from gate devices and geo-fenced phones into one engine.

    3. 03

      Move

      Transfer a crew between projects and the cost centre, roster and access move in one action.

    4. 04

      Demobilize

      Exit waves: end-of-service computed under the article of the labor law that matches the reason for leaving.

    Operate · site attendance

    Attendance stops being an office reconstruction.

    Your sites do not share one clock. Solvait takes all of it into one time and attendance engine.

    • Geo-fenced mobile check-in: a punch only counts inside the site boundary, and the site is stamped on the record.
    • Gate and biometric devices feed the same engine as the phones. One rule set, one timesheet.
    • Rosters, night shifts, Ramadan hours and rest days handled as policy, not a month-end adjustment.
    • The hour that reaches payroll is the hour recorded on site. Nobody retypes it, so nobody can mistype it.
    Main compound
    Biometric turnstile
    Tower crew
    Geo-fenced mobile check-in
    Remote camp
    Supervisor roster on a phone
    One time & attendance engine
    Same rules, same timesheet, every site
    Operate · payroll at labor scale

    Every line on the payslip opens onto the hour that produced it.

    Overtime is where construction payroll breaks. Rawatib runs the monthly cycle at labor scale, and it keeps the working behind every figure.

    • Overtime, rest-day and holiday rates applied by rule, per site and per grade.
    • GOSI contributions and the WPS file come out of the same run as the payslips, so they cannot drift apart.
    • Open any payslip line and it shows the timesheet, the rule and the approval behind it, dated and named.
    • When a worker disputes his pay, the site manager can show him the answer on the spot.
    Payslip lineTraceable to
    Basic salaryEmployment contract, effective date
    Overtime: weekdayTimesheet hours, site rate rule
    Overtime: rest dayRoster exception, supervisor approval
    Housing allowanceGrade policy, camp assignment
    GOSI deductionRegistered establishment, rate by nationality

    Nothing on the payslip is an opinion. Every figure has an hour, a rule and a person attached to it.

    Solvait payroll & compensation
    Project labor costing

    Hours land against the project, not against a department.

    Every hour captured on site carries its project and WBS code from the moment it is recorded, so labor cost per project, phase and element is a report rather than a month-end reconstruction.

    • Cost by project, phase and WBS element, from the same timesheet that produced the payslips.
    • Labor cost visible while the project is still running, not discovered when it closes.
    • Solvait Wise turns it into dashboards: headcount by site, overtime concentration, Saudization by entity.
    • Already on Dynamics 365 Finance & Operations? HR and project accounting are one platform, not two.
    Hour captured on site
    Device or geo-fenced phone
    Carries project & WBS
    Attached at capture, not at month end
    Priced by the payroll run
    Rate, overtime, allowances, GOSI
    Posts to project accounting
    On Dynamics 365, same platform

    One chain from the gate to the ledger. Break it anywhere and project cost becomes an estimate.

    Demobilize · end of service

    End of service, computed to the article. Three hundred times.

    Demobilization is where a labor-heavy company finds out what its HR system is worth. Solvait computes end-of-service under the article of the Saudi Labor Law that matches the reason for leaving.

    • The reason for leaving drives the calculation, because in the law it does.
    • Service computed on actual dates in Hijri or Gregorian, with unpaid leave accounted for.
    • The settlement pulls in unused leave, outstanding overtime and open deductions, so one statement closes the file.
    • The worker receives the working, not just the total. That is what stops a dispute reaching the labor office.
    Final settlement
    • Reason for leaving → labor-law article applied
    • Service period, Hijri and Gregorian
    • End-of-service award, computed to the article
    • Unused leave balance
    • Outstanding overtime from the last cycle
    • Open deductions and advances cleared

    Issued as a statement the worker can read, in Arabic, with every component shown separately.

    Solvait AI HR

    Every request, from every site, in one queue.

    A construction HR office answers people it never sees, on sites that change every quarter. AI HR works the routine overnight against your own policy, and puts only what needs a human decision in front of someone in the morning.

    • Overnight actions summarized every morning, across leave, payroll and compliance.
    • Exceptions escalated for human judgment, with the reason and the record attached.
    • Workers still ask in Arabic from their phones — Khidmat answers on WhatsApp, and the request lands here.
    Mission Control · AI HR
    AI HR Mission Control: the overnight brief, the approvals waiting, and the exceptions escalated for a human decision

    Mission Control: what ran overnight across every site, and what is waiting on a person.

    The compliance that decides whether you can bid.

    On a construction workforce these are not back-office formalities. They are gate conditions, and they all come out of the same records that run your payroll.

    Nitaqat

    Your Saudization band, live. In this sector the band is not a report; it is what qualifies you to bid on government work.

    GOSI

    Registration and contributions per worker and per establishment, Saudi and non-Saudi rates handled correctly, at the scale a labor-heavy payroll actually runs at.

    WPS / Mudad

    The wage protection file produced by the payroll run itself, in the format your bank expects and on the schedule the ministry expects.

    Qiwa

    Employment contracts and workforce data kept consistent with what Qiwa holds, including transfers between your own establishments, so a mismatch never surprises you mid-transaction.

    Muqeem

    Iqama status and expiry tracked from the day a worker is mobilized, with alerts early enough to actually renew rather than to explain why you did not.

    Hijri calendar

    Leave entitlement, end-of-service and contract dates work in Hijri and Gregorian, because half the paperwork on a Saudi project already does.

    Construction and industrial groups already on Solvait

    Construction and infrastructure groups whose HR runs on the platform.

    SALCO, Advanced Construction, Miahona, Al Balagha Group.

    Questions buyers actually ask

    Walk one project from mobilization to demobilization.

    Bring a real project: the manpower plan, the sites, the shift pattern, the close-out date. We will run it through Solvait end to end, so you see your own project rather than a demo tenant.

    Solvi — Solvait AI assistant
    Solvi
    Smart Assistant — Powered by AI
    Welcome to Solvait! 👋 I'm Solvi, your AI assistant. How can I help today, exploring our HR tools, learning about the platform, or booking a demo?